Cleaning a one-room apartment after renovation
Post-renovation cleaning
Apartment cleaning after ceiling renovation
The ceiling in the apartment was repainted. For this reason, post-renovation cleaning was ordered. There was no furniture in the room, which helped to complete the work faster.
Object details
- Apartment area: 79 m2 (one-room apartment).
- Cleaning time: 2.5 hours.
- Ut enim ad minim veniam quis nostrud exercitation
- The remains of whitewash were removed from the floor, walls, ceiling and all surfaces using a construction vacuum. In the second stage, the cleaners washed the floor several times to remove streaks and residual dust. All hard surfaces were also wiped down and washed, and kitchen cabinets were cleaned from the inside.